Research · 6 min read
What an Expedited FDA Review Pathway Changes
Three designations speed up how a drug is developed and reviewed. A fourth mechanism changes what an approval may rest on — and attaches obligations that outlast the approval itself.
Key takeaways
- Breakthrough therapy and fast track designations change development and review process; accelerated approval changes the endpoint an approval may rest on.
- All of these mechanisms require a serious or life-threatening disease or condition, and a breakthrough request must be answered within 60 calendar days.
- Fast track's rolling review lets FDA review portions of an incomplete application, but the agreed review-time goals do not start until the application is complete.
- Accelerated approval can require a postapproval study to verify and describe the predicted benefit, with conditions specified no later than the approval date, and requires publication of a rationale if no study is required.
- Withdrawal of an accelerated approval is available where the confirmatory study fails to verify the benefit or where the sponsor disseminates false or misleading promotional materials — but only through defined procedures including public comment.
- Promotional materials for products under this subpart must be submitted before approval and, after the first 120 days, at least 30 days before dissemination.
Answer first: three of these change the process, one changes the evidence
Section 356 of Title 21 is titled "Expedited approval of drugs for serious or life-threatening diseases or conditions," and it contains several distinct mechanisms that are often lumped together in coverage.
Breakthrough therapy designation and fast track designation are about how a drug is developed and reviewed. They change meetings, communication and review sequencing. Accelerated approval is different in kind: it changes what an approval may be granted on the basis of, by permitting an effect on a surrogate endpoint rather than a directly measured clinical benefit.
The threshold for all of them is the same phrase: a serious or life-threatening disease or condition. None of these provisions is available for a product simply because its sponsor would like to move faster, and every one of them applies to a drug that is still going to be approved, if at all, under the ordinary approval statute.
Breakthrough therapy: a request, a 60-day answer, and a list of actions
The criteria are written into the statute. FDA shall, at the request of a sponsor, expedite development and review of a drug "if the drug is intended, alone or in combination with 1 or more other drugs, to treat a serious or life-threatening disease or condition and preliminary clinical evidence indicates that the drug may demonstrate substantial improvement over existing therapies on 1 or more clinically significant endpoints, such as substantial treatment effects observed early in clinical development."
The request may be made concurrently with, or at any time after, submission of an investigational application. The answer comes on a clock: "Not later than 60 calendar days after the receipt of a request... the Secretary shall determine whether the drug that is the subject of the request meets the criteria."
What designation buys is spelled out as a list of possible actions rather than a promise of approval: holding meetings with the sponsor and the review team throughout development; providing timely advice and interactive communication to make the development program as efficient as practicable; involving senior managers and experienced review staff in a collaborative, cross-disciplinary review; assigning a cross-disciplinary project lead; and taking steps to make trial design as efficient as practicable, including "by minimizing the number of patients exposed to a potentially less efficacious treatment."
Every item on that list is about process. None of them lowers what the drug must eventually show.
Fast track: unmet need, and a review that can start before the file is complete
Fast track designation is available at the sponsor's request where a new drug "is intended, whether alone or in combination with one or more other drugs, for the treatment of a serious or life-threatening disease or condition, and it demonstrates the potential to address unmet medical needs for such a disease or condition," or where the drug is designated a qualified infectious disease product.
Its most concrete consequence sits in a separate subsection. If FDA determines, after preliminary evaluation of clinical data, that a fast track product may be effective, it "shall evaluate for filing, and may commence review of portions of, an application for the approval of the product before the sponsor submits a complete application." That is the mechanism usually described as rolling review.
It comes with two conditions on the applicant: providing "a schedule for submission of information necessary to make the application complete," and paying any applicable user fee. And it comes with a trade-off the statute states plainly — the agreed review-time goals do not apply to an application submitted this way "until the date on which the application is complete." Starting earlier does not start the review clock earlier.
Accelerated approval: a different endpoint, and a study that has to follow
The statutory description is precise. FDA may approve an application for a serious or life-threatening disease or condition "upon a determination that the product has an effect on a surrogate endpoint that is reasonably likely to predict clinical benefit, or on a clinical endpoint that can be measured earlier than irreversible morbidity or mortality, that is reasonably likely to predict an effect on irreversible morbidity or mortality or other clinical benefit, taking into account the severity, rarity, or prevalence of the condition and the availability or lack of alternative treatments."
The implementing regulation says the same thing in the language of trials: approval may be granted "on the basis of adequate and well-controlled clinical trials establishing that the drug product has an effect on a surrogate endpoint that is reasonably likely... to predict clinical benefit," subject to the requirement that the applicant study the drug further "to verify and describe its clinical benefit," and that any such postmarketing studies also be adequate and well-controlled and carried out with due diligence.
The obligations are specified in the statute. Approval may be conditioned on the sponsor conducting a postapproval study to verify and describe the predicted effect, and on submitting copies of all promotional materials during the preapproval review period and, after approval, at least 30 days before dissemination. Not later than the date of approval, FDA must specify the conditions for any required study, "which may include enrollment targets, the study protocol, and milestones, including the target date of study completion." If no postapproval study is required, FDA "shall publish on the website of the Food and Drug Administration the rationale for why such study is not appropriate or necessary."
The regulation adds a separate tool for safety rather than evidence: where a product "shown to be effective can be safely used only if distribution or use is restricted," FDA will require postmarketing restrictions such as distribution limited to certain facilities or physicians with special training or experience, or distribution conditioned on the performance of specified medical procedures.
The obligations that outlast the approval
Accelerated approval is the only one of these mechanisms that comes with an expedited way to undo it. The statute permits withdrawal using expedited procedures if the sponsor fails to conduct a required study with due diligence, if a required study "fails to verify and describe" the predicted effect or benefit, if other evidence demonstrates the product is not shown to be safe or effective under the conditions of use, or if "the sponsor disseminates false or misleading promotional materials with respect to the product."
Those expedited procedures are themselves defined, and they are not summary. Before withdrawal, the sponsor gets due notice, an explanation, an opportunity for a meeting with the Commissioner or a designee, and an opportunity for written appeal to the Commissioner or to a designee who did not participate in the proposed withdrawal. There must be an opportunity for public comment, publication of a summary of comments and FDA's responses, and — if the sponsor requests it and no committee has already advised on the issues — the convening of an advisory committee.
The regulation's own withdrawal list runs parallel and adds two grounds tied to restrictions: that use after marketing demonstrates the postmarketing restrictions are inadequate to assure safe use, and that the applicant fails to adhere to the restrictions agreed upon.
Promotional-material submission is written into the regulation as well: for products being considered for approval under this subpart, applicants must submit all promotional materials intended for dissemination within 120 days following approval during the preapproval review period, and after that first 120 days must submit them at least 30 days before initial dissemination or publication.
None of this is permanent. If FDA later determines that the restrictions, withdrawal-procedure conditions or promotional submission requirements "are no longer necessary for the safe and effective use of a drug product, it will so notify the applicant" — and for products approved on a surrogate endpoint, those requirements ordinarily end when the required postmarketing study verifies and describes the clinical benefit and the product would be appropriate for approval under traditional procedures.
How to read a claim that a drug was expedited
The word expedited in a press release can mean any of four different things, and they are not interchangeable. A breakthrough or fast track designation is a statement about the development and review process, granted on preliminary evidence, and says nothing final about whether the drug will be approved. An accelerated approval is an approval, but one resting on an endpoint reasonably likely to predict benefit, with a verification study attached.
The checkable questions follow from that. Which mechanism is being described, and does the source name the statutory or regulatory provision. If it is an accelerated approval, has a required postapproval study been specified, and has it reported. And if a source claims no study was required, FDA is directed to publish its rationale for that, which means the claim is verifiable rather than a matter of belief.
This article does not say which pathway any particular product used. That is a fact about a specific approval, and it belongs in the approval documents FDA publishes rather than in a general description of the law.
Sources
- 21 U.S.C. 356 — Expedited approval of drugs for serious or life-threatening diseases or conditions (subsections (a), (b), (c) and (d))The breakthrough therapy criteria, the 60-calendar-day determination deadline and the listed actions to expedite development and review; the fast track criteria and the rolling-review provision with its schedule and fee conditions and the statement that agreed review time periods do not apply until the application is complete; the accelerated approval standard including the surrogate endpoint and earlier-measurable clinical endpoint language; the postapproval study and promotional-material conditions, the requirement to specify study conditions no later than the approval date, and the requirement to publish a rationale where no study is required; and the grounds and defined procedures for expedited withdrawal of an accelerated approval.
- 21 CFR 314.510 — Approval based on a surrogate endpoint or on an effect on a clinical endpoint other than survival or irreversible morbidityThe requirement of adequate and well-controlled clinical trials establishing an effect on a surrogate endpoint reasonably likely to predict clinical benefit; the condition that the applicant study the drug further to verify and describe clinical benefit; and the requirement that such postmarketing studies be adequate and well-controlled and carried out with due diligence.
- 21 CFR 314.520 — Approval with restrictions to assure safe useThe examples of postmarketing restrictions FDA will require where a product can be used safely only if distribution or use is restricted, including distribution limited to certain facilities or physicians with special training or experience and distribution conditioned on specified medical procedures, and the statement that limitations imposed will be commensurate with the specific safety concerns.
- 21 CFR 314.530 — Withdrawal proceduresThe regulation's list of grounds for withdrawing an approval granted under this subpart, including failure of a postmarketing study to verify clinical benefit, failure to perform it with due diligence, inadequacy of postmarketing restrictions in use, failure to adhere to agreed restrictions, false or misleading promotional materials, and other evidence that the product is not shown to be safe or effective.
- 21 CFR 314.550 — Promotional materialsThe requirement that applicants submit copies of all promotional materials intended for dissemination within 120 days following marketing approval during the preapproval review period, and thereafter submit promotional materials at least 30 days before initial dissemination or publication.
- 21 CFR 314.560 — Termination of requirementsThe provision that FDA will notify the applicant when the restrictions, withdrawal-procedure conditions or promotional-material requirements are no longer necessary, and the statement that for products approved on a surrogate endpoint these requirements ordinarily end once the required postmarketing study verifies and describes clinical benefit and the product would be appropriate for approval under traditional procedures.
Frequently asked questions
What qualifies a drug for breakthrough therapy designation?
The statute requires that the drug be intended to treat a serious or life-threatening disease or condition and that preliminary clinical evidence indicate it may demonstrate substantial improvement over existing therapies on one or more clinically significant endpoints. FDA must decide on a request within 60 calendar days.
What does fast track designation actually do?
It is granted where a drug is intended for a serious or life-threatening disease or condition and shows potential to address unmet medical needs, or where it is a designated qualified infectious disease product. Its main concrete effect is that FDA may begin reviewing portions of an application before the complete application is submitted, provided the applicant supplies a submission schedule and pays applicable fees.
Does accelerated approval mean less evidence?
It means a different endpoint. Approval may rest on an effect on a surrogate endpoint reasonably likely to predict clinical benefit, or on an earlier-measurable clinical endpoint reasonably likely to predict an effect on irreversible morbidity or mortality. The regulation still requires adequate and well-controlled clinical trials, and adds a requirement to study the drug further to verify and describe its clinical benefit.
What happens if the confirmatory study does not confirm?
The statute allows withdrawal of an accelerated approval using expedited procedures where a required study fails to verify and describe the predicted effect or benefit, where the sponsor fails to conduct it with due diligence, where other evidence shows the product is not shown to be safe or effective, or where the sponsor disseminates false or misleading promotional materials.
Are those expedited withdrawal procedures summary?
No. They require due notice, an explanation, an opportunity for a meeting with the Commissioner or a designee, an opportunity for written appeal to someone who did not participate in the proposed withdrawal, an opportunity for public comment with a published summary and response, and an advisory committee if the sponsor requests one and none has already advised.
Do the extra obligations last forever?
The regulation provides that when FDA determines the restrictions, withdrawal conditions or promotional-material requirements are no longer necessary for safe and effective use, it will notify the applicant. For a product approved on a surrogate endpoint, they ordinarily end once the required postmarketing study verifies and describes clinical benefit and the product would be appropriate for approval under traditional procedures.